Skip to content
DevMeme
3338 of 7590
Agile Post #3665 · source on Telegram

Agile Knight Prioritizes Kanban Board Over Princess Rescue

Description

A cartoon meme depicts a cat princess with a golden crown, looking annoyed from her purple castle tower and shouting, 'OMG JUST DO SOMETHING'. Below, her would-be rescuer, a cat knight in a red cape, is turned away from the tower. Instead of fighting a dragon or climbing the tower, he is meticulously managing a large wooden Kanban board titled 'RESCUING PRINCESS MVP'. The board is divided into three columns: 'TO DO', 'DOING', and 'DONE', with several blue sticky notes in the 'TO DO' and 'DOING' columns and two in the 'DONE' column. The knight is actively moving a task from 'TO DO' to 'DOING'. The meme humorously applies software development's Agile methodology to a classic fairytale. It satirizes situations where developers (the knight) become so engrossed in the process and project management tools that they lose sight of the actual goal, leading to frustration for the stakeholder or client (the princess), who just wants to see results. The 'MVP' (Minimum Viable Product) in the title adds another layer of corporate tech jargon, making the scenario even more absurd

Comments

10
Anonymous ★ Top Pick The princess is the stakeholder whose feature request has been in the backlog for three sprints, while the knight is explaining why 'rescuing' is an epic that needs to be broken down into smaller, story-pointed tasks
  1. Anonymous ★ Top Pick

    The princess is the stakeholder whose feature request has been in the backlog for three sprints, while the knight is explaining why 'rescuing' is an epic that needs to be broken down into smaller, story-pointed tasks

  2. Anonymous

    Even in stone-tower monoliths, leadership assumes throughput doubles if you just shout “JIRA harder.”

  3. Anonymous

    After 15 years in tech, I've learned that even rescuing a princess requires a properly groomed backlog, three planning meetings, and at least one retrospective on why the dragon wasn't in the original requirements

  4. Anonymous

    When your stakeholder is literally trapped in production screaming for help, but you're still moving tickets from 'To Do' to 'Doing' because the retrospective revealed we need better process adherence. Classic case of optimizing the rescue methodology while the castle burns - at least we'll have excellent sprint velocity metrics to present at the post-mortem

  5. Anonymous

    Stakeholder screaming 'ship the MVP' while the epic lacks acceptance criteria - classic sprint zero forever

  6. Anonymous

    Minimum Viable Princess: verify presence, log a heartbeat metric, and defer ladder integration to v2

  7. Anonymous

    I'd love to "just do something," but our expedite lane is at its WIP limit and the ladder microservice is owned by another team

  8. @dellism1 4y

    i wonder whats already done

    1. dev_meme 4y

      Board definitely is in place!

      1. @dellism1 4y

        lmao

Use J and K for navigation