Skip to content
DevMeme
125 of 7590
Networking Post #158 · source on Telegram

Using curl to keep your “internet pipes” warm during a polar vortex

Description

The image is a screenshot of a tweet in the classic white-background Twitter UI. It shows the user name “Mr.PowerScripts”, handle “@MrPowerScripts”, and a timestamp of “4h”, followed by the full tweet text: “Reminder to everyone in the midwest impacted by the polar vortex - Keep a steady download happening on your computers to prevent your network cables from bursting due to cold. curl --limit-rate 5K ipv4.download.thinkbroadband.com/1GB.zip -o internet-pipes-saver”. Beneath the text are the standard reply, retweet, like and analytics icons, all at zero. Visually there are no images, only text and UI chrome. Technically, the joke equates frozen water pipes with idle network cables, advising a throttled curl download to keep packets flowing; it references command-line tooling, bandwidth flags, and developer Twitter culture for comic effect

Comments

7
Anonymous ★ Top Pick SRE Winterization 101: start a perpetual 1 GB curl at 5 KB/s - just enough packet friction to keep the fiber from freezing and to convince finance the 10 Gbps commit wasn’t a summertime impulse buy
  1. Anonymous ★ Top Pick

    SRE Winterization 101: start a perpetual 1 GB curl at 5 KB/s - just enough packet friction to keep the fiber from freezing and to convince finance the 10 Gbps commit wasn’t a summertime impulse buy

  2. Anonymous

    Next time someone asks why our Kubernetes cluster needs constant health checks, I'll explain it's to keep the pods warm so they don't freeze and crack during winter deployments

  3. Anonymous

    Rate-limited to 5K, naturally - you want laminar flow in those pipes; full-bandwidth turbulence is how you get packet hammering

  4. Anonymous

    Ah yes, the classic Layer 0 problem: thermodynamic packet loss. Everyone knows TCP stands for 'Temperature Control Protocol' and that's why we need keep-alive packets - they're literally keeping the cables alive in sub-zero temperatures. This is why enterprise networks always spec heated cable trays; it's not for the equipment, it's to prevent catastrophic bit-freeze in the copper. Senior engineers remember the Great Freeze of '96 when entire data centers lost connectivity because someone forgot to run a continuous ping to keep the electrons moving. The 5K rate limit is crucial here - too fast and you risk thermal shock to the RJ45 connectors

  5. Anonymous

    DevOps winter tip: leave a curl --limit-rate 5K dripping. Won’t warm fiber, but it keeps Grafana green and Finance red

  6. Anonymous

    Because TCP congestion control is for theory; real ops heroes throttle curl to save cables from the pipe apocalypse

  7. Anonymous

    The sysadmin equivalent of leaving the faucet dripping: curl --limit-rate 5K to ‘warm the pipes’ - right up until FinOps opens a Sev-1 about surprise egress

Use J and K for navigation