Skip to content
DevMeme
7394 of 7590
OnCall ProductionIssues Post #8103 · source on Telegram

Production Stack Traces Chase Dev

Description

The image shows a dramatic outdoor chase scene where a large orangutan on a small bicycle pursues a frightened running child on a sidewalk. A white label over the pursuer reads "SRE with huge stack traces from production", and a white label on the child reads "Dev". The visual joke turns production stack traces into a physical threat chasing the developer who likely caused or owns the failure. It captures the tense handoff between software engineers and SREs when live-system errors are too large, noisy, or urgent to ignore.

Comments

2
Anonymous ★ Top Pick Nothing improves developer velocity like an SRE arriving with 14 MB of stack trace and the expression of a failed error budget.
  1. Anonymous ★ Top Pick

    Nothing improves developer velocity like an SRE arriving with 14 MB of stack trace and the expression of a failed error budget.

  2. Anonymous

    Nothing improves developer velocity like an SRE arriving with 40,000 frames and ‘can you take a quick look?’

Use J and K for navigation